|
|
|
|
|
Kumul Platform Refurbishment Work |
|
|
|
The Kumul Platform is a 20 year old platform with accommodation facilities for 16 men. Transerve's scope included offshore site survey & audit, material procurement and installation work pertaining to the refurbishment of the accommodation facilities
more >>
|
|
|
|
|
|
|
|
TLQ aboard offshore platform in Indonesia |
|
|
|
Design and Fabrication of 3 nos A60 fire rated Zone 2 TLQ aboard offshore platform in Indonesia. Transerve also provided support for offshore hookup and testing
more >>
|
|
|
|
|
|
|
|
Transerve delivers Porta Cabins for Chevron Offshore Platform |
|
|
|
Transerve successfully installed & commissioned a 18-Men Temporary Living Quarters aboard Chevron Offshore Platform in the Gulf of Thailand. The units are ABS approved,
A60/ H60 Fire Rated for Zone 2 Hazardous location. The modules are purpose built for lifting by the platform crane and avoids the need of heavy lift vessel.
more >>
|
|
|
|
|
|
|
|
Delivery of Control Room for Sakhalin |
|
|
|
Successful installation of Control Room Module aboard Sakhalin Molikpaq platform. Designed and fabricated by Transerve, the module was built to withstand extreme temperatures of up to -40 deg C, with H120 fire rating, to ABS classification standards.
more >>
|
|
|
|
|
|
|
|
Delivery of TLQ for Carigali Hess |
|
|
|
Transerve successfully delivers Temporary Living Quarters Camp for Carigali Hess Cakerawala Platform. The units were purpose built to A60 Zone 2 ratings with safety features complying to strict offshore requirements.
more >>
|
|
|
|
|
|
|
|
Delivery of TRAM, Helideck & EISR Modules for Topside Deck for Clough/ OMV Maari Field Wellhead Development Platform |
|
|
|
Transerve Pte Ltd delivered the TRAM (Temporary Refuge & Accommodation Module), Helideck and EISR (Electrical & Instrument Switch Room) Modules in January 2008 for the Clough/OMV Maari wellhead platform. The wellhead platform will be installed in the Maari Field, located in the Taranaki Basin, Tasman Sea, off the west coast of the North Island of New Zealand. The field is located 80 km from the coast and 36 km south of the existing Maui B platform.
more >>
|
|
|
|
|
|
|
|
Transerve celebrates its 30th Anniversary |
|
|
|
Transerve celebrates its 30th Anniversary with a dinner at Amara Sanctuary, Sentosa. The dinner was attended by 300 staff and friends. Guests turned up in cultural costumes and were entertained by cultural performances, dances and games.
more >>
|
|
|
|
|
|
|
|
Transerve launches 40m aluminium utility crewboat |
|
|
|
Transerve launches 40m aluminium utility crewboat.
more >>
|
|
|
|
|
|
|
|
Transerve completes the construction of the Maari E-house Module and loads out onto barge |
|
|
|
Transerve completes the construction of the Maari E-house Module and loads out onto barge.
more >>
|
|
|
|
|
|
|
|
Sabah Chief Minister Datu Seri Musa Haji Aman gives support for Sabah Oil and Gas Apprenticeship Programme (SOGAP) in preparing locals for future jobs in Oil and Gas Industry |
|
|
|
Sabah Chief Minister Datu Seri Musa Haji Aman gives support for Sabah Oil and Gas Apprenticeship Programme (SOGAP) in preparing locals for future jobs in Oil and Gas Industry.
more >>
|
|
|
|
|
|
|
|
Jack Up Rig 505 Galveston |
|
|
|
Onboard site survey & upgrading of existing Living Quarters facilities aboard Jack Up Rig 505 Galveston
more >>
|
|
|
|
|
|
|
|
ERHA FPSO Floating Production, Nigeria |
|
|
|
Fabrication of 3 level Temporary Living Quarters, Offices & Laundry aboard ERHA FPSO, Nigeria
more >>
|
|
|
|
|
|
|
|
Transerve wins S$12m contract to build a helicopter hangar complex for the Royal Hong Kong Auxiliary Air Force |
|
|
|
Transerve wins S$12m contract to build a helicopter hangar complex for the Royal Hong Kong Auxiliary Air Force. It was recognised that Transerve has an established track record in the construction of prefabricated steel lattice space frame structures and could complete the project under a tight schedule as required by the Hong Kong government.
more >>
|
|
|
|
|
|
|
|
Transerve develops a cost saving site office for construction projects |
|
|
|
Transerve develops a cost saving site office for construction projects. The first of its kind, it was assembled at the building site of Singapore Land’s Gateway Complex at Beach Road. It comes prefabricated in modules and can be moved from one site to another to be re-used.
more >>
|
|
|
|
|